(310) 734-2245 · Mon to Fri 8am to 6pmServing all of Los Angeles County · Lic. 1083262 · Bonded · Insured
Remodeled kitchen with stainless hood and tile backsplash

Los Angeles Remodeling Cost Guide

Every remodeling cost figure online is either too low or from another city. These are the ranges we see across Los Angeles County, with what pushes a project to the low or high end. They are planning ranges, not quotes; we price every project after a site visit.

Three levels of whole-house renovationThree house cross-sections. Cosmetic renovation touches only surfaces at $60 to $120 per square foot. Replacement redoes everything inside the same plan at $150 to $300. A gut renovation moves walls at $300 to $600.COSMETIC$60 to $120PER SQUARE FOOTPaint, floors, fixtures, lighting.Nothing moves.REPLACEMENT$150 to $300PER SQUARE FOOTKitchens, baths, wiring, plumbing.Same floor plan.GUT$300 to $600PER SQUARE FOOTWalls move, the plan opens up,everything is new.
Three levels, three budgetsMost people describing a remodel mean the middle column and have budgeted for the first.

Cost ranges by project

ProjectTypical LA County rangeMain cost drivers
Cosmetic bathroom refresh$10,000 to $25,000Fixture grade, tile scope
Full bathroom remodel$25,000 to $60,000Layout changes, custom shower, stone
Cosmetic kitchen refresh$20,000 to $40,000Counters, appliances
Full kitchen remodel$35,000 to $100,000Cabinet grade, moved plumbing, structure
Ground-floor addition$300 to $500 per sq ftBathroom included, matching exterior
Second-story addition$400 to $600 per sq ftStructural upgrades below, roof removal
Garage conversion ADU$120,000 to $150,000Slab condition, utilities
Detached ADU$150,000 to $400,000Size, finish, site access, sewer
Whole-house cosmetic$60 to $120 per sq ftPaint, floors, fixtures
Whole-house replacement$150 to $300 per sq ftSystems, kitchens, baths
Whole-house gut renovation$300 to $600 per sq ftStructure, finish level
Bolt and brace retrofit$3,000 to $12,000Crawlspace access, wall length
Soft-story retrofit$60,000 to $200,000+Frames, parking layout
Exterior paint$8,000 to $20,000Height, prep, stucco condition
Re-stucco$15,000 to $40,000Finish type, lath replacement
Composition reroof$15,000 to $35,000Pitch, layers, sheathing
200-amp panel upgrade$3,500 to $7,500Utility coordination
Whole-house repipe$8,000 to $20,000Size, access, material
Central HVAC replacement$12,000 to $25,000Ductwork, heat pump versus gas

What moves every number

  • Age of the building and what is behind the walls
  • Whether plumbing, electrical and structure stay in place
  • Finish selections, which can double a kitchen or bath budget
  • Permit scope and jurisdiction
  • Access, hillside conditions and occupied versus vacant

How to budget

Settle the scope and finishes before pricing, hold a 10 to 15 percent contingency on pre-1970 homes, get a line-item proposal with allowances for anything unselected, and expect written change orders for anything outside scope. Doing several projects at once is almost always cheaper than doing them one at a time.

Los Angeles County figures, updated 2026-10-29. Planning ranges, not a quote, and not legal advice. Rules change, so we confirm what applies to your property before design.

Related questions

Who does this work

Let's talk about your property.

Call, or send the address and what you want to do. We will walk it, confirm what the city allows, and send a written proposal with scope, cost and timeline.

(310) 734-2245Monday to Friday, 8am to 6pm · CSLB 1083262