(310) 734-2245 · Mon to Fri 8am to 6pmServing all of Los Angeles County · Lic. 1083262 · Bonded · Insured
Primary bathroom, green zellige tile and oak vanity

Kitchen & Bathroom Remodeling in Studio City

New kitchens and bathrooms, from a weekend-level refresh to moving walls and plumbing.

Typical cost
$25k to $100kStudio City, 2026
Building department
LADBS (Van Nuys)
Permit needed
Usually yes
Licensed
CSLB 1083262Class B general building

Studio City is City of Los Angeles, so permits run through LADBS. Colfax Meadows and the flatter neighbourhoods have straightforward post-war housing. The canyon streets above have older houses with harder access, and on a narrow hillside street the cost of simply getting materials and crews to the house is a real line item.

What it costs in Studio City

WhatTypical Los Angeles rangeNotes
Bathroom refresh$10,000 to $25,000Fixtures, counters, paint, lighting
Full bathroom remodel$25,000 to $60,000Everything new, same footprint
Primary bath with layout change$60,000 to $120,000+Moved plumbing, custom shower
Kitchen refresh$20,000 to $40,000Counters, appliances, paint
Full kitchen remodel$35,000 to $100,000New cabinets, counters, floors, fixtures
Kitchen with walls removed$120,000+Structural beam, moved plumbing

Los Angeles County figures, reviewed 2026-10-29 by America General Contractors, California contractor licence CSLB 1083262. Planning ranges, not a quote, and not legal advice. We confirm the current rules for your parcel before anything is drawn.

Three levels of kitchen and bathroom remodelThree columns comparing a refresh at $10,000 to $40,000, a full replacement at $25,000 to $100,000, and a layout change at $60,000 to $120,000 and up. Each level includes everything in the level before it.REFRESH$10k to $40kCountersFixturesPaintLightingREPLACEMENT$25k to $100kCountersFixturesPaintLightingCabinetsFlooringTileLAYOUT CHANGE$60k to $120k+CountersFixturesPaintLightingCabinetsFlooringTilePlumbing movesWalls moveDrawings neededEACH LEVEL INCLUDES EVERYTHING TO ITS LEFT
What you get at each levelThe three scopes we quote, and what each one includes. Every level contains everything to its left.

How we approach it here

Kitchens and bathrooms get used every day and move a home's value more than any other room. We do all three versions: a refresh that keeps everything where it is, a full replacement in the same footprint, and a remodel that moves walls and plumbing to get the layout you actually want.

One contractor runs the whole thing. We handle the drawings, the permit, demolition, plumbing, electrical, tile, cabinets, counters and the final fixes. You get one price and one person to call.

Building rules in Studio City

Studio City is in the City of Los Angeles. Hillside properties are subject to the Baseline Hillside Ordinance and often need geotechnical reports, caisson foundations and haul route approvals. The flat neighborhoods near the river support additions, pools and ADUs with straightforward permitting.

Building department

LADBS (City of Los Angeles), Van Nuys office

ZIP codes we cover

91604

Neighborhoods

Colfax Meadows, Fryman Canyon, Silver Triangle, Laurel Canyon, Woodbridge Park

What a kitchen & bathroom remodeling job includes
  • Drawings, material choices and an itemized price
  • City permit and all inspections
  • Demolition, haul-away and dust control
  • New plumbing, gas and electrical, including a bigger panel if you need one
  • Waterproofing, tile, flooring and paint
  • Cabinets, counters, backsplash and fixtures
  • Ventilation, lighting and energy-code paperwork
  • Final clean, walkthrough and written warranty
What moves the price
  • Whether the plumbing and electrical stay where they are
  • Cabinet grade and counter material, which is where most of the money goes
  • How much tile, and how complicated the tile pattern is
  • What is behind the walls in an older house: old pipe, old wiring, water damage
  • Whether the city needs full drawings or just a counter permit
Permits and inspections

In the City of Los Angeles, any work that touches plumbing, electrical, gas or structure needs a permit from the building department. Swapping a faucet or painting does not. Most refreshes are permitted at the counter in a day. Moving a wall or a drain needs drawings first. We pull the permit under our license, so it is our name on it, not yours.

How we run the job

1. Walk the property

We meet you on site, listen, and look at what the building and the city will need. You get a written scope and a budget range.

2. Drawings

When drawings are needed we bring in the architect and engineer, and price the design while it is being drawn.

3. Permit

We file with the city, handle the corrections they send back, and tell you where it stands.

4. Price and contract

An itemized price, a schedule and payment terms. Anything new after signing gets priced in writing first.

5. Build

One supervisor on your job, licensed trades, inspections in order, and a weekly update with photos.

6. Walkthrough

A final fix list, the city's sign-off, and a written warranty on our work.

Studio City questions about kitchen and bathroom remodeling

Do I need a permit for kitchen and bathroom remodeling in Studio City?

LADBS (City of Los Angeles), Van Nuys office Swapping a faucet or painting does not. Most refreshes are permitted at the counter in a day. Moving a wall or a drain needs drawings first. We pull the permit under our license, so it is our name on it, not yours.

How much does kitchen and bathroom remodeling cost in Studio City?

$25k to $100k is the usual range across Los Angeles County, and Studio City sits inside it. The table on this page breaks it down by scope. What moves the number locally is the condition of the existing house and whether the layout changes, not the ZIP code. We price from a walkthrough, not a square-foot rule.

How long does kitchen and bathroom remodeling take in Studio City?

A bathroom refresh takes 2 to 3 weeks on site. A full bathroom runs 4 to 6 weeks. A replacement kitchen is 6 to 10 weeks once the cabinets arrive, and a kitchen with walls coming out is 10 to 16 weeks. Cabinets and counters take 4 to 12 weeks to build, so we order them before demolition starts instead of after.

Do I need a permit to remodel my kitchen in Los Angeles?

If the work touches plumbing, electrical, gas or structure, yes. New cabinets and counters in the same spots, with nothing moved, generally do not need one. Most real remodels do. We pull it under our license.

Can I live in the house during the work?

Most people do. We set up a temporary kitchen, seal the work area with plastic and keep the noisy work in blocks. If it is a full gut and you only have one bathroom, plan to stay elsewhere for part of it.

Other work we do in Studio City

ADU and garage conversion work, room additions, whole-house renovation, seismic retrofit and foundation work. Or see everything on the Studio City page.

Kitchen & Bathroom Remodeling in nearby cities

Pasadena, Beverly Hills, Culver City, Long Beach, Santa Monica, Burbank.

Useful reading

Kitchen & Bathroom Remodeling in Studio City?

Send the address and what you want to do. We will confirm what LADBS (Van Nuys) allows, walk it, and send a written price.

(310) 734-2245Monday to Friday, 8am to 6pm · CSLB 1083262