(310) 734-2245 · Mon to Fri 8am to 6pmServing all of Los Angeles County · Lic. 1083262 · Bonded · Insured
Renovated home in Playa del Rey

General contractor in Playa del Rey

Coastal housing on bluff and flat parcels, inside the coastal zone.

Housing stock
mixed, coastal
Building department
LADBS (West LA office)
ZIP codes
90293
Licensed
CSLB 1083262Class B general building

Playa del Rey mixes older beach cottages, post-war housing and newer construction on parcels ranging from flat to bluff-side, almost all of it within the coastal zone.

What that means for building here

  • Coastal zone status applies across the area and may require a coastal development permit for new construction and major additions.
  • Salt air drives exterior material choices and shortens the life of windows, roofing and exterior finishes.
  • Bluff parcels bring geotechnical and drainage requirements beyond a normal hillside lot.
  • Older beach housing frequently has unbolted foundations and dated systems.

What we do most in Playa del Rey

Housing stock and what it means

Playa del Rey mixes older beach cottages, post-war housing and newer construction on parcels ranging from flat to bluff-side, almost all of it within the coastal zone.

  • Coastal zone status applies across the area and may require a coastal development permit for new construction and major additions.
  • Salt air drives exterior material choices and shortens the life of windows, roofing and exterior finishes.
  • Bluff parcels bring geotechnical and drainage requirements beyond a normal hillside lot.
  • Older beach housing frequently has unbolted foundations and dated systems.
Permits in Playa del Rey

City building departments (Torrance, Redondo Beach, Manhattan Beach, Hermosa Beach)

The beach cities have their own building departments, coastal zone rules near the ocean, and height and lot coverage limits that shape additions and new construction. Torrance and inland Redondo Beach have larger lots and simpler rules. Salt air drives exterior material choices and maintenance scope.

How we run the job

1. Walk the property

We meet you on site, listen, and look at what the building and the city will need. You get a written scope and a budget range.

2. Drawings

When drawings are needed we bring in the architect and engineer, and price the design while it is being drawn.

3. Permit

We file with the city, handle the corrections they send back, and tell you where it stands.

4. Price and contract

An itemized price, a schedule and payment terms. Anything new after signing gets priced in writing first.

5. Build

One supervisor on your job, licensed trades, inspections in order, and a weekly update with photos.

6. Walkthrough

A final fix list, the city's sign-off, and a written warranty on our work.

Playa del Rey questions

Who issues building permits in Playa del Rey?

LADBS (West LA office). City building departments (Torrance, Redondo Beach, Manhattan Beach, Hermosa Beach)

What does the housing stock in Playa del Rey mean for my project?

Playa del Rey mixes older beach cottages, post-war housing and newer construction on parcels ranging from flat to bluff-side, almost all of it within the coastal zone.

Do you work in Playa del Rey regularly?

Yes. Playa del Rey is inside our South Bay service area and we work there regularly. Call (310) 734-2245 or send the address and we will tell you what the parcel allows before anyone draws anything.

Costs for this kind of work

Cost guides

Nearby neighborhoods

Westchester, Hancock Park, Larchmont, Miracle Mile, Cheviot Hills, Mar Vista, Brentwood, Westwood, Woodland Hills, Tarzana.

Planning something in Playa del Rey?

Tell us the address and the goal. We will confirm what the city allows, then walk it and price it.

(310) 734-2245Monday to Friday, 8am to 6pm · CSLB 1083262